American Dreamwrights' past interior work includes:
![]()
>> Arlington, MA - Complete kitchen renovation. Work included complete demolition of existing fixtures and finishes, structural modifications, framing for new kitchen layout, installing new cabinets, tile, finishes and trim; supervising plumbing, electrical and granite countertop subcontractors.
![]()
![]()
![]()
>> Arlington, MA - Complete kitchen remodel. Work included reconfiguring interior partitions for new kitchen layout, installing new cabinets, tile, finishes and trim; supervising plumbing, electrical and granite countertop subcontractors.
![]()
![]()
![]()
>> Arlington, MA - Complete bathroom remodel. Work included demolition of existing fixtures and finishes, framing, installing new finishes and trim, tiling, painting and supervising plumbing and electrical subcontractors.
![]()
>> Brookline, MA - Bathroom remodel. Work included select demolition of fixtures and finishes, updating of the sink and shower plumbing, and installing new ceramic subway tile with glass accent tile.
![]()
>> Charlestown, RI / Phase 1 – Custom addition and renovation designed by Brian Healy Architects. Phase 1 consisted of replacing an existing rooftop green house with a new solarium and roof deck. Work included cantilevered steel beam roof framing, extensive structural reinforcements, a floor-to-ceiling sliding glass wall, custom windows, continuous wall-to-ceiling-to-floor shiplap wrapped wood trim and bamboo paneled walls. See exteriors for more pictures.
![]()
![]()
![]()
>> Charlestown, RI / Phase 2 - Custom addition and renovation designed by Brian Healy Architects. Phase 2 consisted of constructing a new master bedroom veranda on the 2nd floor and renovating the existing dining room area on the 1st floor. Work included extensive structural reinforcements, 4 floor-to-ceiling sliding glass walls, continuous wall-to-ceiling-to-floor shiplap wrapped wood trim and bamboo paneled walls. See exteriors for more pictures.
![]()
![]()
![]()
>> Dedham, MA - Construction of 2nd floor master suite and 1st floor powder room and wet bar designed by Studio Troika. Work consisted of select demolition and structural modifications, reconfiguring and rebuilding the attic stairway to create more space for the master bath, framing for the new bathroom layout, installing tile, finishes and trim including a sliding pocket door and electric radiant floor heat mat; supervising electrical and plumbing subcontractors. Custom cabinetry by Silva Woodworking.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
>> Lexington, MA / Phase 2 - Collaborated with architect-owner to construct master bedroom suite. Work included framing for bathroom and walk-in closet partitions, construction of maple plywood panelled walls, fabrication of custom shelves, dressing table, bathtub sleepers and slider doors and installation of slider door hardware, Elfa shelving systems and interior transom windows. See exteriors for more pictures.
![]()
![]()
![]()
![]()
>> Natick, MA - Complete bathroom remodel. Work included demolition of existing fixtures and finishes, framing, installing new tile, finishes and trim, painting and supervising plumbing and electrical subcontractors.
![]()
![]()
>> Roslindale, MA - Kitchen and bathroom remodel. Work included installing new cabinets and appliance panels, medicine cabinets and vanities.
![]()
>> Stonington, CT- Complete renovation and adaptive re-use conversion of antique barn to live/work residence and art studio. Work included extensive structural repairs, traditional post and beam timber-framing of 3rd floor loft area, reconditioning salvaged building materials for re-use (including antique floor boards, original tongue and groove barn boards, vintage plumbing fixtures, doors and wood casement windows), framing partition walls and stairways, installing tile, finishes and trim, fabricating kitchen cabinets and countertops and supervising plumbing, heating, electrical, wood stove and utility subcontractors. Green building practices included a high-efficiency propane fired boiler and radiant floor heating system, sprayed-in, Icynene insulation, water conserving toilets, salvaged and reconditioned building materials, sustainable and/or locally sourced building materials including bamboo countertops and cork flooring and the historic preservation and adaptive re-use of an existing structure. See exteriors for more pictures.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
>> West Roxbury, MA - Complete kitchen remodel. Work included demolition of existing cabinets, fixtures and appliances, installing new cabinets, finishes and trim and supervising plumbing, electrical and granite countertop subcontractors.
![]()
![]()
![]()
>> Brookline, MA - Work included installation of finish trim, window casings, sills, crown moldings and electric radiant floor heating system for private residence’s new yoga room.
![]()
![]()
![]()
>> Burlington, MA - Work included fabricating and installing a custom built-in media center, trim and painting.
![]()
![]()
>> Lexington, MA / Phase 1 - Collaborated with architect-owner to construct new garden studio and loft. Work included structural framing, sheathing, window and door installation, siding and trim. Interior work included wood flooring, railings and trap door in the loft area, a polished concrete floor with radiant heat, a custom built "stone curtain" window, customized work tables, and "live edge" shelving units. See exteriors for more pictures.
![]()
>> Roslindale, MA - Renovation and fit-out of an existing retail space into the Boston Cheese Cellar (www.bostoncheesecellar.com), purveyors of gourmet cheeses and specialty foods. Collaborated with owners to maximize available square footage for retail sales and tastings as well as on-site storage and mail-order operations. Work included select demolition, framing for new layout and stairway access to cellar, installing new cabinets, display shelving finishes and trim, and painting; supervising plumbing, electrical, wood floor and marble countertop subcontractors.
![]()
![]()
![]()
![]()
>> Lexington, MA - Work included fabricating and installing a stairway railing system that can easily be removed by the homeowner when moving large furniture between floors.
>> Burlington, MA -- Work included subdividing an attic space into two livable rooms; framing, crown molding, plastering and painting.
>> Stonington, CT - Work included creating a 3rd story timberframed loft; structural post and beam repairs; framing for a entry vestibule and other interior rooms. See interiors above.
![]()
![]()
>> Westford, MA - Work included constructing a second floor loft and stairs as part of a structural overhaul to an antique barn. See preservation.
![]()
American
Dreamwrights – custom builders
(617) 851-4001 | info@americandreamwrights.com